The "seamless" secret of steel structure houses: professional handling of panel overlaps to eliminate leaks and hidden dangers.


Release Date:

2025/11/20

In the world of steel structure buildings, the roofing system serves as the "skin" of the building, directly facing the erosion of wind and rain as well as the harsh exposure of the sun. Sheets of color-coated steel, sandwich panels, and insulated panels make up this sturdy protective shell. However, many owners encounter issues such as leaks, drafts, and decreased insulation performance after project completion, and the root cause often lies not in the materials themselves, but in a seemingly trivial yet crucial detail—The lap treatment of the panel.

As a professional steel structure company integrating design, production, processing, and installation, we deeply understand:"The devil is in the details." Perfect joints are the lifeline that ensures the long-term safety and watertightness of steel-structured houses. Why is the panel overlap so critical? The lap joints of the panels are the weakest point of the roof. If not handled properly, it can lead to a series of problems: Rainwater leakage:This is the most common problem; wind and rain can seep through the joints, damaging indoor equipment and decoration. Thermal bridge effect:Loose joints can create heat exchange channels, leading to significant loss of air conditioning in summer and heating in winter, thereby increasing energy consumption. Wind damage:In strong wind areas, inadequately overlapping panels can easily be lifted by the wind, causing significant damage. Dust and pests:Small gaps can become passages for dust and insects, impacting the indoor environment. Our professional splicing treatment solution: meticulous craftsmanship, forging perfection. For different products and building sections, we have a set of scientific and rigorous overlap treatment methods to ensure that every connection is "seamless." 1. Horizontal overlap: The art of flowing downstream. Lateral overlapping refers to the overlapping of panels in the vertical direction along the slope of the roof. Standard requirements:We determine the overlap length strictly based on the roof slope and local rainfall intensity. Generally, the smaller the slope, the longer the overlap length (usually no less than 250mm). Sealing treatment:At the joint, we useDedicated waterproof sealantBefore the upper and lower panels are bonded together, we will continuously and evenly apply sealant along the overlapping edges of the lower panel to form the first line of elastic sealing defense. Fixed skills:The fixed screws must be driven into the crest position of the overlap and matched withHigh-quality EPDM waterproof gasket"Our"Steel structure accessorie


Online Consultation

If you have any suggestions, please leave a comment or send us an email.

%{tishi_zhanwei}%

Nantong Xingyuan Yi New Materials Co., Ltd.

Address

Address

No. 196, Baidian Road, Baidian Town, Hai’an County, Nantong City, Jiangsu Province, China